WCT 公司简介 | WCT Profile | Latest News | Events | Contact Us | Search | Website Update
Delivering World Class Visions
 
Engineering & Construction > Track Records > Infrastructure > North Manama Corridor Improvement Project - SEEF, Bahrain
Durrat Al-Bahrain Highway, Bahrain
Malaysia-Singapore Second Crossing - Taman Perling to Pulai Interchange - Package 3
North Manama Corridor Improvement Project - SEEF, Bahrain
Dukhan Highway, Qatar
Dubai World Central International Airport, UAE
Sungai Kelalong Dam, Bintulu, Sarawak
Universiti Teknologi Mara, Kuala Selangor, Malaysia
Guthrie Corridor Expressway, Selangor
Kajang to Seremban Highway, Malaysia
Middle Ring Road II - Karak to Jalan Taman Melati - Package 4
Improvement of Existing Subang Jaya Interchange
Simpang Pulai - Gua Musang - Kuala Berang Highway - Package 3/1B
Kuala Kangsar - Grik
East Coast Expressway 1E3 & 1E4
Connaught Bridge


North Manama Corridor Improvement Project - SEEF, Bahrain

This forms part of the proposed North Manama Corridor Improvement Project, which consist of reconstruction of 2.2 kim of dual 3-lane arterial from Seef Roundabout to Pearl Roundabout i.e. Al Seef Flyover and Central Market Interchange.

The Proposed highway works under this contract included :

Al-Seef Flyover consisting two parallel independent 3-Span bridge structure utilising triple-cell box girder with total length of 112.0 meters covering 15.90 meters width. The Structure is designed to be founded on 800 mm dia. cast in-place bred piles with reinforced concrete pile caps. The Government of Bahrain take initiative to up-grade Al-Seef Flyover from 3-Span to 5-Span bridge structure in view of the massive development going on at Al-Seef District.

Central Market Interchange consisting three parallel independent 3-Span bridge structure utilising triple-cells box girder in combination of 3-Span twin-cells box girder. Total length of the structure is 106.0 meters and the total width is 12.1 meters.

The scope of works to be performed under this contract includes Site Clearing & Earthworks, Bridge, flyovers and interchange, road and associated works, Open box beam (Guard Rail), Drainage Works.

Project Sum  :  RM 100M