The Curve Building Construction is divided into four (4) contracts, which consists of : Basement, Road Tunnel, Buildings and Infrastructure. The proposed building complex is intended to house a mixed development comprising retail units, office space, pedestrian malls, a 150 rooms 4 star hotel and 2-level basement car parks. Total development area is approximately 13 acres (52,609m2).
| Gross Floor Area of |
m2 |
| Basement |
123,300 |
| Podium |
120,500 |
| Hotel Tower |
7,000 |
The scope of works shall comprise, but not limited to : Structural and Architectural works, Roof, External works, M&E works
There are alternative construction method adopted in this projects : 1. Hollow Core Slab 2. Precast Half Slab 3. System Formwork
Contract Sum : RM 226 Million |